Product Offering from Rudolph Brothers

Rudolph Brothers is pleased to introduce a product from CrossLink Technologies which aims at simplifying the lives of Urethane users.

The Crosslink Three Component Variable Hardness system is designed to produce a range of parts anywhere from 10 to 90 Shore A. Now, instead of keeping a different urethane in stock for each level of hardness, you simply keep this Crosslink material in stock. By varying the mix ratios, you can create the hardness you need, on demand. There is no more waiting on material to be shipped to you! Also available in an Abrasion Resistant version.

Request a quote today or call us at 1-800-375-0605 to place an order.

More Information from CrossLink:

THREE COMPONENT VARIABLE HARDNESS POLYURETHANE™

CLV 1V-019-A/B/C (Patent Pending)

CROSSLINK® Three Component Variable Hardness System is designed for hand batching according to the following procedure:

There is no need to warm Part-A, B or C, as all components are low viscosity liquids at room temperature. We recommend that all mixing should be carried out at room temperature.

1. Pre-weigh and mix Part-A and B according to the recommended mix ratios (by weight) in a plastic or metal container at room temperature. Any additives such as pigments and fillers if required should be added to the mix at this point.

2. Place the sample in a vacuum chamber and adjust the vacuum to minimum of 29 in. of Mercury. Degassing should continue until most of the bubbling has ceased. De-gassing of Part-A and B should not take more than 5 min.

3. While Part-A and B are degassing, weigh out the correct amount of Part-C in a container at room temp. Degas Part-C at RT. If necessary, degassing aid (Sag-47) can be added to part-C to speed up degassing process.

4. Add the Part-C to pre mixed Part-A and B. Mix thoroughly with out whipping too much air into the mix. Make sure that the walls and the bottom of the container are being scraped during mixing. There should be no swirls visible and the mixture should be completely homogeneous.

5. Place the mixture back into vacuum chamber and degas until most of the air that was mixed-in is gone. This usually takes no more than 5 minutes. A good rule of thumb is when the surface of the mixture is more than half clear of bubbles under good vacuum, degassing is usually adequate. Pour times of less than 5 minutes usually do not allow degassing after mixing.

6. Pour the mixture into a preheated mold that has been sprayed or coated with mould release. The temperature of the mould should determine the de-mould time for the cast part. The processors should determine their own mould temperature. It could be anywhere between 60°C to 100°C. Higher the mould temperature shorter the de-mould time. In most cases cured part can be de-moulded in minutes. However, keep in mind that the longer the gel time, the longer the de-mould time.

7. Recommended post cure time: 4 hrs. @ 100°C.
or 6-8 hrs @ 800C
or 66 hrs @ 600C
or 7 days @ 250C

The preceding steps are meant to be a guide for hand batching Crosslink Urethane Systems. After becoming familiar with this technology, it will become apparent that steps may be shortened or eliminated.

Request a quote today or call us at 1-800-375-0605 to place an order.